Immutable archive edition
Edition · 2026-08-09
- Composed
- Aug 9, 2026, 03:14 PM UTC
- Last verified update
- 2 days ago
- Record class
- public permanent
- First published
- Aug 9, 2026, 03:14 PM UTC
- Payload SHA-256
- c6e05b20601ee8af…
- Lifecycle
- published · 1 events
- Active Sections
- 2
- Verified signals
- 31
- Live changes
- 20
- Last material update
- 2 days ago
- Snapshot
- 50fc47bd
Lead signal · Expectations
Track topic →Will the highest temperature in Hong Kong be 36°C on August 9?
+74.9pp · 24hDirection only · complete 7d history unavailable
Observed
YES moved up by 74.9 percentage points over 24 hours.
Secondary signals
3 Verified
Secondary signal · Rules
2-Propenoic Acid, 2-Methyl-, Telomer With 1-Dodecanethiol, and 2-Methyloxirane Polymer With Oxirane Monoether With 1,2-Propanediol Mono(2-Methyl-2-Propenoate) in Pesticide Formulations; Exemption From the Requirement for a Tolerance
not published→final
Observed2-Propenoic Acid, 2-Methyl-, Telomer With 1-Dodecanethiol, and 2-Methyloxirane Polymer With Oxirane Monoether With 1,2-Propanediol Mono(2-Methyl-2-Propenoate) in Pesticide Formulations; Exemption From the Requirement for a Tolerance is recorded by the Federal Register as final.
Secondary signal · Rules
Special Conditions: ATR-GIE Avions de Transport Régional Model ATR42-500 and ATR72-212A Airplanes; Electronic System Security Protection From Unauthorized Internal Access
not published→final
ObservedSpecial Conditions: ATR-GIE Avions de Transport Régional Model ATR42-500 and ATR72-212A Airplanes; Electronic System Security Protection From Unauthorized Internal Access is recorded by the Federal Register as final.
Secondary signal · Expectations
Will FC Energie Cottbus win on 2026-08-09?
29.0%→100.0%+71.0pp
ObservedYES moved up by 71.0 percentage points over 24 hours.
Live signal feed
Most recent first
Significant changes
Verified changes impacting monitored signals
State transition
Auction of FM Broadcasting Construction Permits Scheduled for February 2, 2027; Notice and Filing Requirements, Minimum Opening Bids, Upfront Payments, and Other Procedures for Auction 114
Auction of FM Broadcasting Construction Permits Scheduled for February 2, 2027; Notice and Filing Requirements, Minimum Opening Bids, Upfront Payments, and Other Procedures for Auction 114 is recorded by the Federal Register as final.
- not published
- final
Auction of FM Broadcasting Construction Permits Scheduled for February 2, 2027; Notice and Filing Requirements, Minimum Opening Bids, Upfront Payments, and Other Procedures for Auction 114 is recorded by the Federal Register as final.
Probability move
Will Malmo FF win on 2026-08-09?
YES moved down by 66.5 percentage points over 24 hours.
Archive snapshots
Archive
Chronological, immutable publication record.